Party Wall Surveyor in Haringey
Party Wall Matters Across Haringey
Construction across Haringey routinely raises party wall obligations. Rear extensions to Victorian terraces through Hornsey, Crouch End and Wood Green, basement digs on Edwardian property around Muswell Hill, refurbishments across the borough's conservation areas, and large regeneration schemes consented by the London Borough of Haringey at Tottenham Hale and the High Road corridor all routinely require notice under the Party Wall etc. Act 1996.
CHP Surveyors has been established since 2004 with offices in Wickford, London and Hampshire. Our London head office at Boundary Row in SE1 is RICS regulated and delivers specialist chartered surveying on dense urban sites with technical depth. Haringey coverage extends from Highgate edge and Muswell Hill through Crouch End and Hornsey to Wood Green and Tottenham. Larger Tottenham regeneration projects often pair with airspace development advice on rooftop work.

Party Wall etc. Act 1996
James Crowley is the past London and National Chair of The Pyramus and Thisbe Society, an organisation with a great interest in party wall and neighbourly matters.
Having been involved in projects across the UK for both domestic properties and larger, city centre developments, we have experience and knowledge of the more complicated methods of construction, including temporary restraint works, piling to form a triple basement and jet grouting. We have also negotiated licences for the use of scaffolding and tower cranes.
Services Provided
- Party Wall advice
- Serving Notices under the Act
- Schedules of Condition
- Agreeing Award documentation
- Scaffolding, Tower Crane and Access Licences

What steps does a Haringey party wall instruction take?
A Haringey party wall instruction takes the same steps regardless of project scale. Step one is a free initial assessment with a qualified surveyor from our London office, covering the proposed works, the relevant sections of the Act, and the notice strategy. Haringey projects typically involve party structure notices for terrace extensions, line of junction notices for new boundary walls, and section 6 excavation notices for basement digs through the Edwardian and Victorian stock.
Step two is notice drafting and service, managing adjoining owner responses, and preparing a detailed schedule of condition with photographs and full written notes. Step three handles the party wall award where dispute arises, or proportionate paperwork where the matter is agreed without dispute. The named surveyor stays on the file throughout. Building owners and adjoining owners across Haringey get continuity from first contact through to the final document delivered at completion.
Over the past four years, CHP have worked very successfully with us in their capacity as party wall surveyors. Through his calm, sensible approach and excellent communication skills James Crowley, in particular, gained the trust and confidence of the entire team and stakeholders. Looking forward to working with CHP again.”
- Clare Goggin, Jackson Coles
How do we protect building owners on Haringey projects?
On Haringey projects, building owners are protected by three things working in combination: notices served correctly and on time, a schedule of condition that captures the adjoining property in detail before disturbance, and a valid award where dispute arises. Together these reduce the risk of injunction proceedings and post-completion damage claim on builds that often involve period property within metres of neighbours.
Notice periods under the Party Wall etc. Act 1996 are fixed at two months for party structure works and one month for excavations within the relevant proximity thresholds. The building owner generally covers reasonable fees on both sides. For Haringey projects, particularly basement work in Muswell Hill conservation areas, an early free initial assessment reduces risk on both sides.

Case Studies
Vincent Place, Southampton
Services Provided
- Initial Site Appraisal
- Daylight + Sunlight Report
- Party Wall Negotiations
- Pre-Acquisition strategic advice
28 Cardozo Road, London, N7
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Lord Street Car Park, Gravesend
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Empire Wharf, London, E9
Services Provided
- Daylight + Sunlight Report
- A point of contact with the existing leaseholders
- Acting as the Building Owner’s Surveyor under the Party Wall etc. Act 1996
Vincent Place, Southampton
Services Provided
- Initial Site Appraisal
- Daylight + Sunlight Report
- Party Wall Negotiations
- Pre-Acquisition strategic advice
28 Cardozo Road, London, N7
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Lord Street Car Park, Gravesend
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Empire Wharf, London, E9
Services Provided
- Daylight + Sunlight Report
- A point of contact with the existing leaseholders
- Acting as the Building Owner’s Surveyor under the Party Wall etc. Act 1996
FAQ
What if my neighbour in Haringey does not respond to the notice?
When should a party wall notice be served?
Are you familiar with London Borough of Haringey planning requirements?
What is a schedule of condition?
How long does the party wall process take?
Contact Us
Get in touch.
Head Office
2-6 Boundary Row
London, SE1 8HP
Essex Office
2nd Floor, 10 High Street
Wickford, Essex
SS12 9AZ
020 3714 4090
enquiries@chpsurveyors.com