Our team prepares these reports under RICS regulation from our London office at Boundary Row, SE1, with BRE 209 (2022) as the working reference. Where works cross a shared boundary, party wall services sit alongside the daylight piece, and the practice has been delivering daylight and sunlight reports since 2004.


Overshadowing analysis on ground-level amenity tests the 21 March sun position recommended in the guidance. Sunpath studies cover seasonal access where these add useful evidence, particularly on the Meridian Water masterplan phases where cumulative shadow effects matter to the planning conversation. Trees within the impact zone are factored in where they materially affect the outcome.
A typical turnaround is 2 to 3 weeks from instruction. Calls are answered by a qualified surveyor rather than a call centre, and a free initial assessment sets out scope before any fee is committed. This is a bespoke surveying service shaped to each scheme.
The 2 to 3 week turnaround means the report fits within most planning programmes without slowing submission. Reports follow BRE 209 (2022), and the free initial assessment runs through scope before any fee is set, so an early read on whether a full study is needed costs nothing to obtain at this stage.