Our Essex team prepares these reports under RICS regulation from our Wickford office, with BRE 209 (2022) as the working reference. Site attendance across the Thurrock area runs faster than for London-led practices, and we have been delivering daylight and sunlight reports across the East of England since 2004. Where works cross a shared boundary, party wall services sit alongside the daylight piece.


Vertical Sky Component covers light to windows. Annual Probable Sunlight Hours covers sunlight to habitable rooms with relevant orientation. Overshadowing analysis tests amenity space under the 21 March sun position. Sunpath studies sit alongside where seasonal access matters, particularly on the riverside and industrial regeneration plots where orientation matters to the result.
The report sets out methodology, figures, and design rationale where the numbers run below BRE 209 reference values. Typical turnaround is 2 to 3 weeks from instruction. A free initial assessment confirms scope before any fee is set. This is a bespoke surveying service shaped to each scheme.
A well-argued report sets out the shortfall, explains the cause, and shows the design steps taken to mitigate it. Reports are turned around in 2 to 3 weeks. The free initial assessment is the way in for borderline cases or for early advice on whether a full study is needed at this stage.
