Party Wall Agreements for Sutton Projects
Most Sutton projects raise party wall obligations from the design stage. Rear and side extensions to the borough's 1930s suburban stock across Sutton town, Cheam and Carshalton, refurbishments to Victorian and Edwardian property in Wallington and Sutton, conservation work, and infill development consented by the London Borough of Sutton all routinely require notice under the Party Wall etc. Act 1996.
CHP Surveyors has been established since 2004 with offices in Wickford, London and Hampshire. Our London head office at Boundary Row in SE1 is RICS regulated and delivers specialist chartered surveying on dense urban sites with technical depth. Sutton coverage extends from Sutton town through Cheam and Wallington to Carshalton, Worcester Park and Beddington. Many extension projects also pair with daylight and sunlight reports at the planning design stage.

Party Wall etc. Act 1996
James Crowley is the past London and National Chair of The Pyramus and Thisbe Society, an organisation with a great interest in party wall and neighbourly matters.
Having been involved in projects across the UK for both domestic properties and larger, city centre developments, we have experience and knowledge of the more complicated methods of construction, including temporary restraint works, piling to form a triple basement and jet grouting. We have also negotiated licences for the use of scaffolding and tower cranes.
Services Provided
- Party Wall advice
- Serving Notices under the Act
- Schedules of Condition
- Agreeing Award documentation
- Scaffolding, Tower Crane and Access Licences

What's the workflow on a Sutton party wall job?
The workflow on a Sutton party wall job runs from initial assessment through to final award. Step one is a free initial assessment with a qualified surveyor from our London office, covering the proposed works, the relevant sections of the Act, and the notice strategy. Sutton projects typically involve party structure notices for suburban extensions, line of junction notices for new boundary walls on infill plots, and section 6 excavation notices for any deep foundation work close to adjoining buildings.
Step two is notice drafting and service, managing adjoining owner responses, and producing a detailed schedule of condition with photographs and full written notes. Step three handles the party wall award where dispute arises, or proportionate paperwork where the matter is agreed without dispute. The named surveyor stays on the file throughout. Building owners and adjoining owners across Sutton get continuity from instruction to final document.
Over the past four years, CHP have worked very successfully with us in their capacity as party wall surveyors. Through his calm, sensible approach and excellent communication skills James Crowley, in particular, gained the trust and confidence of the entire team and stakeholders. Looking forward to working with CHP again.”
- Clare Goggin, Jackson Coles
What outcomes does CHP target on Sutton projects?
CHP targets three outcomes on Sutton party wall projects: the build programme stays on track, the relationship with adjoining property owners holds up through completion, and the legal position is documented if damage is alleged after the work. Together these protect building owners against injunction proceedings, mid-build disputes, and post-completion damage claims.
Notice periods under the Party Wall etc. Act 1996 are fixed at two months for party structure works and one month for excavations within the relevant proximity thresholds. The building owner generally covers reasonable surveyor fees on both sides. For Sutton projects, particularly suburban extensions affecting close neighbours and conservation work in older parts of the borough, an early free initial assessment at the design stage reduces risk on both sides.

Case Studies
Vincent Place, Southampton
Services Provided
- Initial Site Appraisal
- Daylight + Sunlight Report
- Party Wall Negotiations
- Pre-Acquisition strategic advice
28 Cardozo Road, London, N7
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Lord Street Car Park, Gravesend
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Empire Wharf, London, E9
Services Provided
- Daylight + Sunlight Report
- A point of contact with the existing leaseholders
- Acting as the Building Owner’s Surveyor under the Party Wall etc. Act 1996
Vincent Place, Southampton
Services Provided
- Initial Site Appraisal
- Daylight + Sunlight Report
- Party Wall Negotiations
- Pre-Acquisition strategic advice
28 Cardozo Road, London, N7
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Lord Street Car Park, Gravesend
Services Provided
- Daylight + Sunlight Analysis
- Overshadowing Analysis
- Daylight + Sunlight Report
- Assessment of proposed accommodation’s access to daylight and sunlight
Empire Wharf, London, E9
Services Provided
- Daylight + Sunlight Report
- A point of contact with the existing leaseholders
- Acting as the Building Owner’s Surveyor under the Party Wall etc. Act 1996
FAQ
What if my neighbour in Sutton does not respond to the notice?
What is a freeholder's role in party wall works?
Are you familiar with London Borough of Sutton planning requirements?
What if my property is leasehold?
What is the role of a third surveyor?
Contact Us
Get in touch.
Head Office
2-6 Boundary Row
London, SE1 8HP
Essex Office
2nd Floor, 10 High Street
Wickford, Essex
SS12 9AZ
020 3714 4090
enquiries@chpsurveyors.com